Rotherham Metropolitan Borough Council Council Online Planning - Decision Notice Summary

Planning Application Number: RB2021/1355
Site Address: former Howarth House Brinsworth Lane Brinsworth 9999
Description: Erection of 14 No. dwellings with associated internal access road, parking and landscaping
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 19 January 2022
Decision Date: 19 January 2022
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Proposed to be Delegated
Conditions / Reason for Refusal: General 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below): Location Plan (at scale 1:1250) BL15-1 rev A – Site Layout BL15-2 – Block 1 Plans BL15-3 – Block 2 Plans BL15-4 rev A – Block 3 Plans Reason To define the permission and for the avoidance of doubt. Materials 03 Before work commences above ground level on the construction of the dwellings hereby approved, details of the materials to be used in the construction of the external surfaces of the development hereby permitted shall be submitted to the Local Planning Authority or samples of the materials shall be left on site, and the development shall thereafter be carried out in accordance with the approved details/samples. Reason To ensure that appropriate materials are used in the construction of the development in the interests of visual amenity. Amenity 04 Prior to the commencement of development, a Construction Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The Construction Management Plan shall include: • Details of the proposed access to the site for all vehicles associated with the development on the application site; • Traffic management measures during the construction work; • The location of the site compound and staff parking; • Measures to deal with dust; • Measures to deal with mud in the highway; • All loaded lorries leaving the site shall be securely and effectively sheeted. • Details of proposed hours of construction on/deliveries to the site; and such further matters as the Local Planning Authority may consider necessary. • Details of any generators on site. • Details of site manager in relation to potential complaints. • Details of the quality of soil and its movement and temporary storage during construction. Reason In the interests of highway safety and residential amenity. Air Quality and Emissions 05 Prior to the occupation of any dwelling, details of the infrastructure to allow every future homeowner on the site to fit their own specific Electric Vehicle Charging connection plate, shall be submitted to and approved by the Local Planning Authority. Each dwelling shall not be occupied until the approved infrastructure has been provided, and they shall thereafter be retained. Reason In the interests of air quality and to provide appropriate facilities for electric vehicles. Highways 06 Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either; a/ a permeable surface and associated water retention/collection drainage, or; b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site. The area shall thereafter be maintained in a working condition. Reason To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity. 07 Before the development is brought into use the visibility splays indicated on drawing number 1136-1-DR Rev E plan shall be provided. The area within the visibility splay shall form part of the adopted highway. Reason In the interests of highway safety. 08 Before the development is brought into use the car parking area shown on the approved plan shall be provided, marked out and thereafter maintained for car parking. Reason To ensure the provision of satisfactory garage/parking space and avoid the necessity for the parking of vehicles on the highway in the interests of road safety. 09 Before the first dwelling is occupied, a Travel Plan shall have been submitted to and approved by the Local Planning Authority. The plan shall include clear and unambiguous objectives, modal split targets together with a programme of implementation, monitoring, validation and regular review and improvement. The Local Planning Authority shall be informed of and give prior approval in writing to any subsequent improvements or modifications to the Travel Plan following submission of progress performance reports as time tabled in the monitoring programme. For further information please contact the Transportation Unit (01709) 822186. Reason In order to promote sustainable transport choices. Landscapes / Trees 10 Landscaping of the site as shown on the approved plan (drawing no. 1252 BWL01A) shall be carried out during the first available planting season after commencement of the development. Any plants or trees which within a period of 5 years from completion of planting die, are removed or damaged, or that fail to thrive shall be replaced within the next planting season. Assessment of requirements for replacement planting shall be carried out on an annual basis in September of each year and any defective work or materials discovered shall be rectified before 31st December of that year. Reason To ensure that there is a well laid out scheme of healthy trees and shrubs in the interests of amenity. 11 No operations (including initial site clearance) shall commence on site in connection with development hereby approved until a suitable scheme (Arboricultural Method Statement) for the protection of existing trees and hedgerows has been submitted and its installation on site has been approved in writing by the Local Planning Authority. All protection measures must fully detail each phase of the development process taking into account demolition/site clearance works, all construction works and hard and soft landscaping works. Details shall include the following: • Full survey of all trees on site and those within influencing distance on adjacent sites in accordance with BS5837*, with tree works proposals. All trees must be plotted on a site plan**, clearly and accurately depicting trunk locations, root protection areas and canopy spreads. • A plan** detailing all trees and hedgerows planned for retention and removal. • A schedule of tree works for all the retained trees specifying pruning and other remedial or preventative work, whether for physiological, hazard abatement, aesthetic or operational reasons. All tree works shall be carried out in accordance with BS 3998. • Soil assessments/survey • Timing and phasing of works • Site specific demolition and hard surface removal specifications • Site specific construction specifications (e.g. in connection with foundations, bridging, water features, surfacing) • Access arrangements and car parking • Level changes • Landscaping proposals • A Tree protection plan** in accordance with BS5837* detailing all methods of protection, including but not restricted to: locations of construction exclusion zones, root protection areas, fit for purpose fencing and ground protection, service routes, works access space, material/machinery/waste storage and permanent & temporary hard surfaces. • Soil remediation plans, where unauthorised access has damaged root protection areas in the construction exclusion zones. • Details of the arboricultural supervision schedule. All tree protection methods detailed in the approved Arboricultural Method Statement shall not be moved or removed, temporarily or otherwise, until all works including external works have been completed and all equipment, machinery and surplus materials have been removed from the site, unless the prior approval of the Local Planning Authority has first been sought and obtained. *Using the most recent revision the of the Standard ** Plans must be of a minimum scale of 1:200 (unless otherwise agreed by the Local Planning Authority) Reason To ensure appropriate tree protection in the interests of protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change. 12 A suitable scheme of proposed tree planting and pits shall be submitted to and approved by the Local Planning Authority prior to the first dwelling hereby approved being occupied. The scheme shall include the following comprehensive details of all trees to be planted: • Full planting specification - tree size, species, the numbers of trees and any changes from the original application proposals. • Locations of all proposed species. • Comprehensive details of ground/tree pit preparation to include: o Plans detailing adequate soil volume provision to allow the tree to grow to maturity o Engineering solutions to demonstrate the tree will not interfere with structures (e.g. root barriers/deflectors) in the future o Staking/tying method(s). o Five year post planting maintenance and inspection schedule. All tree planting must be carried out in full accordance with the approved scheme in the nearest planting season (1st October to 28th February inclusive). The quality of all approved tree planting should be carried out to the levels detailed in British Standard 8545, Trees: from nursery to independence in the landscape - Recommendations. Any trees which die, are removed, uprooted, significantly damaged, become diseased or malformed within five years from the completion of planting, must be replaced during the nearest planting season (1st October to 31st March inclusive) with a tree/s of the same size, species and quality as previously approved. Reason To ensure appropriate tree protection in the interests of protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change. Drainage 13 The site shall be developed with separate systems of drainage for foul and surface water on and off site. The separate systems should extend to the points of discharge to be agreed. Reason In the interest of satisfactory and sustainable drainage. 14 No building or other obstruction including landscape features shall be located over or within 3 metres either side of the centre line of the public sewer i.e. a protected strip width of 3 metres, that crosses the site. Furthermore, no construction works in the relevant area(s) of the site shall commence until measures to protect the public sewerage infrastructure that is laid within the site boundary have been implemented in full accordance with details that have been submitted to and approved by the Local Planning Authority. The details shall include but not be exclusive to the means of ensuring that access to the pipe for the purposes of repair and maintenance by the statutory undertaker shall be retained at all times. If the required stand-off or protection measures are to be achieved via diversion or closure of the sewer, the developer shall submit evidence to the Local Planning Authority that the diversion or closure has been agreed with the relevant statutory undertaker and that, prior to construction in the affected area, the approved works have been undertaken. Reason In the interest of public health and maintaining the public sewer network. 15 There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to:- a) evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical; b) evidence of existing positive drainage to public sewer and the current points of connection; and c) the means of restricting the discharge to public sewer to a restricted rate of no more than of 27.83 litres per second. Reason To ensure that no surface water discharges take place until proper provision has been made for its disposal and in the interest of sustainable drainage. Land Contamination 16 Prior to above ground works commencing, a limited Phase II Intrusive Site Investigation should be undertaken to assess for the potential presence and extent of contamination. The investigation and subsequent risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority. The above shall be conducted in line with the new guidance document ‘Land Contamination Risk Management’ (October 2020) and predecessor guidance ‘Model Procedures for the Management of Land Contamination, CLR 11 (Environment Agency, 2004) and BS10175:2011+A2 2017 (BSI, 2017) Reason To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. 17 Subject to the findings of item 1 above and prior to above ground works commencing, a Remediation Method Statement shall be provided and approved by this Local Authority prior to any remediation works commencing on site. The works shall be of such a nature as to render harmless the identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. The approved Remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The Local Authority must be given two weeks written notification of commencement of the remediation scheme works. Reason To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. 18 If during development works significant contamination is encountered, the local planning authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. Reason To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. 19 If subsoil/topsoil is required to be imported to site for gardens and areas of soft landscaping, then these soils will need to be tested at a rate and frequency to be agreed with the Local Authority to ensure they are free from contamination. Reason To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. 20 Following completion of any remedial/ground preparation works a Validation Report should be forwarded to the Local Authority for review and comment. The validation report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the validation report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all validation data has been approved by the Local Authority. Reason To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. Waste Management Plan 21 Prior to the first dwelling hereby approved being occupied a Waste Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The Plan will need to include: 1) information on the amount and type of waste that will be generated from the site; 2) measures to reduce, re-use and recycle waste within the development, including the provision of on-site separation and treatment facilities (using fixed or mobile plants where appropriate); 3) an assessment of the potential to re-use or adapt existing buildings on the site (if demolished it must explain why it is not possible to retain them); 4) design and layouts that allow effective sorting and storing of recyclables and recycling and composting of waste and facilitate waste collection operations during the lifetime of the development; 5) measures to minimise the use of raw materials and minimise pollution of any waste; 6) details on how residual waste will be disposed in an environmentally responsible manner and transported during the construction process and beyond; 7) construction and design measures that minimise the use of raw materials and encourage the re-use of recycled or secondary resources (particularly building materials) and also ensure maximum waste recovery once the development is completed; and 8) details on how the development will be monitored following its completion. The agreed details shall be implemented and thereafter maintained. Reason To minimise the amount of waste used during the construction and lifetime of the project and to encourage the re-use and recycling of waste materials on site. Communication 22 Prior to first occupation of a dwelling on this site, information relating to the availability of infrastructure to enable the provision of gigabit capable full fibre broadband should be submitted and approved by the LPA. If the necessary infrastructure is available to enable provision, details of measures to facilitate the provision of gigabit-capable full fibre broadband for the development hereby approved, including a timescale for implementation, shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason In accordance with Local Plan Policy SP61 ‘Telecommunications’ and Chapter 10 of the NPPF. The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved before development can start. Conditions numbered 04 and 11 of this permission require matters to be approved before development works begin; however, in this instance the conditions are justified because: i. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination. ii. The details required under condition numbers 04 and 11 are fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured.’ Informative(s) 01 You should note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust which may arise during the construction phase. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in a fine of up to £20,000 upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to reducing general disturbance by restricting the hours that operations and deliveries take place, minimising dust and preventing mud, dust and other materials being deposited on the highway. 02 Nature conservation protection under UK and EU legislation is irrespective of the planning system and the applicant should therefore ensure that any activity undertaken, regardless of the need for any planning consent, complies with the appropriate wildlife legislation. If any protected species are found on the site then work should halt immediately and an appropriately qualified ecologist should be consulted. For definitive information primary legislative sources should be consulted. Furthermore, vegetation removal should be undertaken outside of the bird breeding season, March to September inclusive. If any clearance work is to be carried out within this period, a nest search by a suitably qualified ecologist should be undertaken immediately preceding the works. If any active nests are present, work which may cause destruction of nests or, disturbance to the resident birds must cease until the young have fledged. 03 The South Yorkshire Police Architectural Liaison Officer recommends that the development is designed and built to Secured by Design standards. www.securedbydesign.com 04 With regard to condition 22 the attached document would need to be sent out with the decision notice and filled in and submitted with any discharge of condition application. The information would be sent to SFSY, again at hello@superfastsouthyorkshire.co.uk who will assess the information provided. 05 The planning permission is subject to a Legal Agreement (Obligation) under Section 106 of the Town and Country Planning Act 1990. The S106 Agreement is legally binding and is registered as a Local Land Charge. It is normally enforceable against the people entering into the agreement and any subsequent owner of the site. 06 Yorkshire Water have stated that if the developer is looking to have new sewers included in a sewer adoption agreement with Yorkshire Water (under Section 104 of the Water Industry Act 1991), he should contact our Developer Services Team (telephone 0345 120 84 82, email: technical.sewerage@yorkshirewater.co.uk) at the earliest opportunity. Sewers intended for adoption should be designed and constructed in accordance with the WRc publication 'Sewers for Adoption - a design and construction guide for developers' 6th Edition as supplemented by Yorkshire Water's requirements. POSITIVE AND PROACTIVE STATEMENT During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.