Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below)
(Drawing numbers Location plan, existing site plan H2057 01, amended proposed site and block plan H2057 02 Rev A, floor plans and elevations H2057 03)(received 16/04/21, 21/05/21).
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form/shown on drawing (elevations floor plans and elevations H2057 03). The development shall thereafter be carried out in accordance with these details.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with Core Strategy Policy CS28 Sustainable Design.
04
When the proposed access has been brought into use, the existing access shall be permanently closed and the footway / kerbline reinstated in accordance with details to be submitted to and approved by the Local Planning Authority.
Reason
In the interests of road safety
05
Before the development is brought into use, that part of the site to be used by vehicles shall be properly constructed with either
a/ a permeable surface and associated water retention/collection drainage, or
b/ an impermeable surface with water collected and taken to a separately constructed water retention / discharge system within the site.
All to the satisfaction of the Local Planning Authority and shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and to encourage drivers to make use of the parking spaces and to ensure that the use of the land for this purpose will not give rise to the deposit of mud and other extraneous material on the public highway in the interests of the adequate drainage of the site and road safety.
06
Before the development is brought into use the car parking area shown on the site layout (ref 02A) shall be provided, marked out and thereafter maintained for car parking.
Reason
To define the permission and for the avoidance of doubt.
07
The premises shall be used within Use Class E(g) (formerly B1(c) Light industrial) and for no other purpose (including any other purpose in Class E of the Schedule to the Town and Country Planning (Use Classes) Order, 2020, (or any Order revoking and re-enacting that Order with or without modification).
Reason
To define the permission to prevent other potentially unsuitable uses within an open E Use Class and for the avoidance of doubt.
08
Drainage works shall not begin until details of the proposed means of disposal of foul and surface water, including details of any off-site work and on site attenuation of surface water flows, have been submitted to and approved by the Local Planning Authority and the development shall not be brought into use until such approved details are implemented.
Reason
To ensure that the development can be properly drained in accordance with the Local plan and the NPPF.
09
No piped discharge of surface water from the application site shall take place until
works to provide a satisfactory outfall, other than the existing local public sewerage, for surface water have been completed in accordance with details submitted to and
approved by the Local Planning Authority.
Reason
To ensure that the site is properly drained and in order to prevent overloading, surface water is not discharged to the public sewer network.
Informative
Flood resilient construction measures (such as raising electric points, etc.) should be used for the buildings to ensure that if the development was to flood damage would be kept to a minimum.
Positive and Proactive Statement
The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions, or was amended to accord with them. It was considered to be in accordance with the principles of the National Planning Policy Framework.
|