Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of
three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act
1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the
approved site plan and the development shall only take place in accordance with the
submitted details and specifications and as shown on the approved plans (as set out
below)
(Drawing numbers 020020-AAD-01-ZZ-DR-A-0001-P04)(Received
20/04/2021)(020020-AAD-01-ZZ-DR-A-0008-P03-WIP - Received 10/05/2021)
(Drawing numbers 020020-AAD-01-22-DR-A-0005-P04/0003-P04/0004-
P04)(Received 02/12/2021)
Reason
To define the permission and for the avoidance of doubt.
04
The materials to be used in the construction of the external surfaces of the
development hereby permitted shall match those used in the existing building.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity and in
accordance with Core Strategy Policy CS28.
05
Notwithstanding the provisions Schedule 2, Part 1, Class A, B, C, D and E of the
Town and Country Planning (General Permitted Development) Order 2015 (or any
order revoking and re--enacting that Order with or without modification), no further
extensions or outbuildings shall be erected [other than those expressly authorised
by this permission] without the prior permission of the Local Planning Authority.
Reason
In the interests of protecting the openness and character of the Green Belt and in
accordance with the NPPF.
Positive and Proactive Statement
The applicant and the Local Planning Authority engaged in pre application
discussions to consider the development before the submission of the planning
application. The application was submitted on the basis of these discussions. It
was considered to be in accordance with the principles of the National Planning
Policy Framework.
|