Rotherham Metropolitan Borough Council Council Online Planning - Decision Notice Summary

Planning Application Number: RB2021/0787
Site Address: The Garage Clarence Street Dinnington 9999
Description: Reserved matters application (details of landscaping) for the demolition of existing buildings and erection of 7 No. dwellinghouses (reserved by outline RB2019/0277)
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 17 June 2021
Decision Date: 17 June 2021
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Proposed to be Delegated
Conditions / Reason for Refusal: 01 The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below) and in accordance with all approved documents. PC470/01, received 15 April 2021 PC470/03 rev C, received 14 June 2021 PC470/04, received 15 April 2021 PC470/05, received 15 April 2021 PC470/06, received 15 April 2021 PC470/07, received 15 April 2021 Reason To define the permission and for the avoidance of doubt. 02 The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form/shown on drawing no PC470/05. The development shall thereafter be carried out in accordance with these details. Reason In order to ensure a satisfactory appearance in the interests of visual amenity. 03 Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either; a/ a permeable surface and associated water retention/collection drainage, or; b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site. The area shall thereafter be maintained in a working condition. Reason To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity 04 The drainage details shown on drawing number PC470/03 rev C submitted and approved under RB2021/0848 shall be implemented prior to the first dwelling being occupied, unless otherwise agreed in writing with the Local Planning Authority. Reason To ensure that the development can be properly drained and will be safe from flooding. 05 Details of the proposed means of disposal of foul and surface water, including details of any off-site work and on site attenuation of surface water flows, shall be submitted to and approved by the Local Planning Authority and the development shall not be brought into use until such approved details are implemented. Reason To ensure that the development can be properly drained. 06 Prior to the occupation of any dwelling, details of the infrastructure to allow every future homeowner on the site to fit their own specific Electric Vehicle Charging connection plate, shall be submitted to and approved by the Local Planning Authority. Each dwelling shall not be occupied until the approved infrastructure has been provided, and they shall thereafter be retained. Reason In the interests of sustainable development and air quality. Informative(s) 01 You should note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust which may arise during the construction phase. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in a fine of up to £20,000 upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to reducing general disturbance by restricting the hours that operations and deliveries take place, minimising dust and preventing mud, dust and other materials being deposited on the highway. 02 The four South Yorkshire Authorities have committed to ensuring that relevant developments are provided with Gigabit-capable full fibre broadband. Further information can be found in the attached Informative Note. POSITIVE AND PROACTIVE STATEMENT Whilst the applicant did not enter into any pre application discussions with the Local Planning Authority, the proposals were in accordance with the principles of the National Planning Policy Framework and did not require any alterations or modification.