Conditions / Reason for Refusal: |
01
[PC97] The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications as shown on the approved plans (as set out below) except as shall be otherwise agreed in writing by the Local Planning Authority.
Site plan received on 26th November 2008
(Drawing number 28/116 drg no. 2)(received 26th November 2008)
(Drawing number P6219001A Rev 0)(received 6th February 2009)
02
[PC67] No part of the land other than that occupied by buildings shall be used for the storage of goods, components, parts, waste materials or equipment without the prior written approval of the Local Planning Authority.
03
[PC51] The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
04
[PC12] Details of the proposed means of disposal of foul and surface water drainage, including details of any off-site work, shall be submitted to and approved by the Local Planning Authority and the development shall not be brought into use until such approved details are implemented.
05
An approved Soakaway Test shall be carried out to demonstrate the suitability of the ground for all proposed surface water disposals. A report outlining the details of the test shall be submitted to and approved by the Local Planning Authority and any approved measures in the report shall be implemented before the commencement of works.
06
The dust abatement plant, as detailed in drawing P6219001A Rev 0, received 6th February 2009, shall be installed and commissioned before the extension hereby approved is brought into use.
01
[PR97] To define the permission and for the avoidance of doubt.
02
[PR67] To prevent the land from becoming unsightly in the interests of visual amenity and in accordance with UDP Policy ENV3.1 ‘Development and the Environment’.
03
[PR51] In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with UDP Policy ENV3.1 ‘Development and the Environment’.
04
[PR12] To ensure that the development can be properly drained in accordance with UDP policies ENV3.2 ‘Minimising the Impact of Development’ and ENV3.7 ‘Control of Pollution’.
05
[PR12] To ensure that the development can be properly drained in accordance with UDP policies ENV3.2 ‘Minimising the Impact of Development’ and ENV3.7 ‘Control of Pollution’.
06
In the interests of controlling emissions and protecting air quality and in accordance with Policy ENV3.7 'Control of Pollution'.
|